UC Riverside:
Description: HOA provided the mechanical, electrical, plumbing, fire protection, life safety, and telecommunications/teledata engineering services on the project. This project consists of two separate new buildings. One building is a 3-story, 72,000 square feet, consisting of office and office support, instructional space including computer laboratories and regular classrooms, and faculty research laboratories. The other building is a new 9,800 square foot auditorium building for 600 students.
|
New Instructional/Research Surge Building |
Cal State Fullerton:
Description: This innovative central heating and cooling plant upgrade and expansion is for a 24-building campus of 2,480,000 square feet. The unique design concepts developed by Mr. Henrikson for use on this project have resulted in an all-electric central heating and cooling plant that is reliable, economical, energy-efficient, and virtually zero-polluting. The cooling plant includes three new 1,200-ton electrical centrifugal chillers in series, a new two-cell architectural cooling tower, 2,530,000 gallons of chilled water thermal energy storage (TES) (37,000 ton-hours), and a variable flow chilled water distribution system. The heating plant consists of a heat recovery chiller that produces 19 million Btus per hour for campus heating from chiller waste heat, 466,000 gallons of hot water thermal energy storage, two electric boilers for supplemental and back-up heating only on non-on-peak electricity, and a variable flow, low temperature hot water distribution system.
|

Central Heating and Cooling Plant with Thermal Energy Storage |
UC Irvine:
Description: HOA provided the mechanical, electrical, plumbing, fire protection, life safety, and telecommunications/teledata engineering services on this two-part project to upgrade the campus’ athletic building and to add additional athletic facilities. The first phase includes seismic retrofit, expansion of the Weight Training and Sports Medicine facilities, Women’s and Men’s Locker Room improvements, and Entry Lobby and Student Entry Plaza upgrades. The second phase consists of a variety of new buildings, including the Aquatics Building, Aquatics Multipurpose, a 130-Seat Auditorium, Grand Stands, Public Restrooms, Ticketing, and the Academic Study Center. |
Crawford Hall Athletic Building Addition and Renovation |
|
|
|